Cutting-edge access control solutions
CIE Group provides a complete access control design and supply service for professional installers, integrators and specifiers across the UK. From small commercial premises to residential buildings, work with our team to create practical, future-proof access control systems that meet your project requirements.
How can we help?
UK-based stock & fast supply
We’re the UK’s main dealer for the 2N and Akuvox door entry and access control systems, providing fast turnaround on leading products.
Modern identification technologies
We'll help you select the right credential strategy based on security level, user convenience and scalability needs.
Free system design service
From the first site survey to final product specification, our experts work with you to design a system that meets your exact requirements.
Free access control system design service
Our in-house access control specialists support you from initial concept through to system configuration and handover – at no additional cost.
Our service includes:
- Project consultation and system architecture design
- Product selection and full specification
- Integration advice for CCTV, intercom, fire and building management systems
- Pre-build and configuration support
Explore our access control product range
We're a tier-one UK supply partner for leading professional access control manufacturers, providing:
- Access readers
- Access controllers
- Smart locks
- Door locks
- Access control accessories
A range of touchless access control solutions
Our access control solutions support a wide range of secure and contactless entry methods, including:
- RFID credentials
- NFC technology
- Smartphone and mobile access
- QR code access
- PIN and multi-factor authentication
Related products...
Product name
Product name
Product name
Product name
Product name
Product name
Frequently asked questions about our building access control solutions
How do access control systems work?
How do you design an access control system for a commercial building?
What is the difference between standalone and networked access control?
Which access control credentials are most secure?
Do you install access control systems?
Learn more from our experts.
How To Set-up Single Tenant Mode on Akuvox Cloud | Akuvox support
This article explains how to set-up Single Tenant Mode on Akuvox Cloud
How to add APN Settings to the Akuvox R20K-L using the AK Partner App
Need to configure mobile network settings for your R20K-L4G LTE Intercom? In this tutorial, we walk you through adding custom APN details via the AK Partner app – ensuring smooth LTE connectivity with your Akuvox device.
2N Door Intercom – IP Style 9157101
An introduction to the 2N IP Style Smart Door Intercom – 9157101.
Akuvox X933 – How to Disable Busy Tone
CIE Tech Team demonstrates how to disable the Busy Tone on the Akuvox X933 indoor intercom answering panel.
Setting up DTMF codes for the Akuvox X912
The CIE Tech Team demonstrates how to quickly and easily set the DTMF Codes of the Akuvox X912 Door Intercom
How to Configure Input Triggers on the Akuvox R20K and X912
In this guide, the CIE technical team demonstrates how to configure input triggers on the Akuvox R20K and X912 devices. This allows external switches such as push buttons or wired sensors to trigger the intercom’s relay, ideal for automating gates or door strikes.
Setting up a Relay on the Akuvox X912 Door Intercom
The CIE Tech Team demonstrates how to quickly and easily set a Relay on the Akuvox X912 Door Intercom.
Akuvox X933 – How to enable an Intercom Preview
CIE demonstrates how to quickly and easily set up an Intercom preview on the Akuvox X933 Indoor Monitor.
How to connect 2N Wavekey Mobile Access Credentials
We take a look at how to generate mobile credentials for 2N’s WaveKey technology for mobile access control.
Setting up Manager Dial on the Akuvox X912 Door Intercom
CIE’s Ashleigh Wilson demonstrates how to quickly and easily set the Manager Dial on the Akuvox X912 Door Intercom.
How to enable Config on Cloud / Auto Mode unlocking on your intercom
Step-by-step guide to set your indoor monitor’s Unlock button to use cloud relay control (Config on Cloud / Auto Mode), including soft key setup, saving changes, and testing.
How to Change an Akuvox Relay from Monostable to Bistable Mode
In this quick guide, the CIE technical team demonstrates how to change a relay on an Akuvox device from monostable (timed trigger) to bistable (toggle on/off) mode. This setup is particularly useful for gate automation where you want the relay to remain open until manually closed via app or PIN input.